In accordance with 21 (1) (a-c) of the Otago Regional Plan for Water:
This effluent plan was prepared in October 2024 and will be reviewed by October 2025 with the results noted in this section with changes recorded automatically. The contents of this Effluent Management Plan are available to the regional council on written request.
Total Farm Area:
192.4ha
Effective Area:
168.7ha
Person in charge
Glenn Barbour
Ph: 027 227 2685
Address
480 Island Cliff-Duntroon Road, Island Cliff, Oamaru
Legal Description
Lot 2 DP 364585 Sec 31 Blk II Sec 45 Blk VII Maerewhenua SD
Land Owner
Barbour Holdings Ltd
Farm description
Dairy Farm
At present there are no relevant existing consents.
In accordance with Schedule 21 (2) (e) of the Otago Regional Plan for Water.
Effluent Discharge Area: 146.1ha (123.8ha pivot and 22.3ha K-Line).
Effluent flows by gravity from the cow shed through a weeping wall to a sump. It is then pumped to either the storage pond or to the pivots and K-Line.
Cows: Up to 640 cows milking twice a day across both farms, and 200 cows per day for winter milking.
In accordance with Schedule 21 (2) (e) (iv) of the Otago Regional Plan for Water
Click here to access the S - Map for Island Cliff Dairy. The effluent application area consists primarily of Ngapara silt loam which is low risk FDE Category D well drained flat land under 7 degrees of slope. According to Dairy NZ industry best practice the maximum effluent irrigation depth allowed is 10mm when a soil water deficit is identified that is greater than the application rate. This is achieved by application using low rate centre pivots which apply as little as 1.5mm and up to 10mm. K-Line is also used to apply up to 10mm when the pivots are unavailable. Bucket tests are used to verify application rates and soil moisture deficit is determined a minimum of 24 hours after rain by two permanent soil moisture probes. The application rate must not result in exceeding Field Capacity.
Deep silt loam
Well drained.
High profile available water (54mm).
FDE risk category D.
No known subsurface drains are in the effluent discharge area.
Only the upper reaches of critical source areas (CSA's) have effluent applied to them and there is a minimum of 275m of grass buffer before the CSA reaches a waterway.
In accordance with Schedule 21 (2) (f) of the Otago Regional Plan for Water
The effluent pump is maintained monthly as part of the dairy shed inspection. For major issues that can't be repaired in-house contact an irrigation specialist.
Electrical issues are to be referred to an electrician.
All maintenance and repairs are recorded in a maintenance record.
Establish there is a soil moisture deficit using the soil moisture meter. This doesn't need to be done every time - only if there has been rain since the last reading. Do not apply effluent if there is already ponding, if cows will graze it within 24 hours, or if the ground is frozen or covered in snow.
Select application area to maximise an even rotation around the entire effluent area then check that effluent will not enter a waterway - including over land, directly or indirectly or through storm water or pipe. Only apply effluent within the effluent area on the map above.
Consider wind direction to prevent effluent spray or odour leaving the boundary. Do not apply effluent within 50m of the boundary upwind of the boundary in more than fifteen knots of wind.
Check the irrigator is set up, including that drag hose bends have a radius of 1.5m to prevent kinking.
Start pump. Listen for unusual noise which may indicate a fault.
Inspect system as detailed below.
Record effluent application.
Limit flow on D gate to minimum.
Pre-wet concrete ahead of milking to speed up hose down at the end.
Cooler water used for washdown.
Application depth settings to be used to adjust application depth according to soil moisture.
Soil moisture deficit to be established to prevent run off to nearby water races or leaching.
Effluent pond levels to be kept as low as possible to provide maximum freeboard at any time in case of adverse weather.
During June and July irrigators are run at maximum speed when spreading effluent. Furthermore, effluent is spread across the entire effluent area as much as practical.
Solids are spread annually, and cannot be spread on the same area more than once every two months, preferably by incorporating into cultivation of land.
Solids are not spread onto land when the soil moisture exceeds field capacity; or within 20 metres of waterways, or the farm boundary.
Solids are also not spread where previous applications are still visible on the ground, or where soil moisture exceeds field capacity (a reading of 39% VWC on the soil moisture meter).
Hazardous substances, hazardous waste and human effluent is not to be added to the effluent system.
In accordance with Schedule 21 (2) (g) of the Otago Regional Plan for Water
Inspect the system for leaks, ponding and run off each time the pump is started up and in passing during the day. Check that the sprinklers are under pressure and turning normally. Leaks, ponding, run off and flow through drainage can cause the effluent to enter a waterway which must not occur.
As part of the monthly shed inspection check the area around the storage pond for wet patches, areas of grass that are greener than the grass surrounding it or any other signs of leaking from the pond. Include a check of the stone traps to ensure they aren't becoming blocked.
Bucket tests are completed triennially on the irrigators to verify application depth and rate.
In addition to the checks after start up staff are to check the same components while the effluent is running if they are passing the irrigator at least once a day.
All staff are to report any odour from the system if it reaches the farm boundary, or if any complaints are received about the effluent system including odour.
The half circle pivot is not to have effluent run through it when pointing towards the Duff homestead if there is more than 15kt of wind.
When a leak, ponding or run off are discovered the pump must be turned off immediately and the fault reported to the farm owner within half an hour. Where possible the problem should be fixed immediately and recorded.
For major issues that can't be repaired in house contact an irrigation specialist.
Effluent applications are recorded in the dairy diary and reported at audits for the irrigation company, ORC and Fonterra.
In accordance with Schedule 21 (2) (h) of the Otago Regional Plan for Water
Island Cliff Drop Test
Date of last test: 1/10/24
Date next test is due: 1/10/29
Dairy Effluent Storage Calculator
In accordance with Schedule 21 (2) (i) of the Otago Regional Plan for Water
The effluent system has several measures to prevent discharges to water:
Monitoring
Low pressure/high flow automatic pump cut out.
Anti-siphon
Low rate application systems.
Large storage pond. We never know when we will need to pump to storage or when we can empty the storage so we use every opportunity to drain effluent out of storage and apply to the paddocks. If there is effluent in storage and the soil has the appropriate soil water deficit to irrigate then emptying storage is a priority.
Low water use creates less effluent with greenwash in the yard and recirculated cooler water for the wash down hoses.
In accordance with Schedule 21 (2) (j) of the Otago Regional Plan for Water
When a leak, ponding or run off are discovered the pump must be turned off immediately and the fault reported to the farm owner within half an hour. Where possible the problem should be fixed immediately and recorded.
For major issues that can't be repaired in house contact an irrigation specialist.
If a leak is detected in the effluent storage pond it must be emptied as soon as possible within the limits of the soil water deficit and the leak found and repaired.
A register of effluent complaints must be available to the Otago Regional Council on request. If a complaint is received use this form to collect the following information:
(a) The date, time, location, and nature of the complaint
(b) The name, phone number and address of the complainant – unless the complainant elects not to supply, this information
(c ) Action taken by the consent holder to remedy the situation and any policies or methods put in place to avoid or mitigate the problem occurring again.